Approximate estimate of materials needed:
pieces of 8 foot mains.
pieces of 4 foot cross-tees. (only for metal grid)
pieces of 2 foot cross-tees. (If your ceiling tile is 2' x 2')
pieces of 8 foot wall mold;
For a 2 x 4 Metal Grid and you only use 4' t's and no 2' double the 4' t's above
Notes:
Quanties Per Box of Vinyl (RP) and Metal Grid
Our Metal Ceiling Grid: 20 per box for 8' Mains, 20 per box for 8' Wall Mold, 60 per box for 2' or 4' Cross T's.